-
주공정 방법 (Critical Path Method; CPM)
2021.04.10 17:20 jklim54
-
품질 비용 (Cost of Quality)
2021.04.10 17:20 jklim54
-
최종 비용 (Ultimate Cost)
2021.04.10 17:20 jklim54
-
엔지니어 견적 (Engineer’s Estimate)
2021.04.10 17:19 jklim54
-
미래비용 (Future Costs)
2021.04.10 17:19 jklim54
-
리스크기반견적 (Risk-Based Estimate)
2021.04.10 17:19 jklim54
-
리스크 준비금 (Risk Reserve)
2021.04.10 17:19 jklim54
-
용지보상 단계 (Right-Of-Way(ROW) Phase)
2021.04.10 17:18 jklim54
-
기초 비용 견적 (Base Cost Estimate)
2021.04.10 17:18 jklim54
-
VaR (Value at Risk) 예상 최대 손실 금액
2021.04.10 17:18 jklim54